Shenzhen, China

Production coordination

From Confirmed Configuration to Shipment Preparation

Production information is organized around the selected product series and order. Process details, inspection scope and documentation should be confirmed before production.

What to review

Information for the Next Project Step

01

Material and production preparation

Order configuration, module and cabinet direction, control components and packing requirements are reviewed before scheduling.

02

Assembly and screen testing

Production-stage checks may include module appearance, cabinet assembly, screen playback and order-specific inspection items.

03

Packing and shipment checks

Quantity, labels, accessories, spare parts and packing method are checked against the confirmed order scope.

PROJECT SUPPORT

Have a project in mind?

Send the application, approximate screen size and destination for an initial product direction.

Send Project Details →

Start with a rough project brief

Get a More Relevant LED Display Recommendation

Share the application, approximate width and height, viewing distance, installation environment and destination. Detailed drawings are helpful but not required for the first reply.

  • Product-family review
  • Configuration questions
  • Quotation scope
Project Quote→